This article is in English.
Two interior quotations for the same flat can differ by lakhs — and often they are not quoting the same thing. Knowing how to read a quotation protects your budget and avoids arguments later.
What a clear quotation includes
- Room-wise items — for example Bedroom 1: wardrobe, loft, bed, side tables.
- Size of each item in feet and inches.
- How it is charged — per square foot, per running foot, per piece or a fixed (lump sum) price.
- Material and grade — plywood brand and grade, laminate or veneer, hardware type.
- Rate and amount for each line.
- What is included — fitting, transport, handles, edge banding, polish.
- What is not included — electrical, painting, civil work, GST.
- Payment schedule and timeline.
Per square foot: how it is measured
Most furniture in Mumbai is priced per square foot of front area (width × height). A wardrobe 7 feet wide and 7 feet high is 49 sq ft. Lofts are usually priced separately. Kitchens are sometimes priced by running foot of counter. Always check how area is calculated, because "per sq ft" from two contractors may not measure the same way.
| Charged as | Example |
|---|---|
| Per sq ft | Wardrobe, TV unit, kitchen shutters |
| Per running foot | Kitchen counter, loft |
| Per piece | Bed, dining table, chairs |
| Lump sum | Pooja unit, special items |
Hidden costs to ask about
- Hardware upgrades — soft-close hinges and channels may be "extra".
- Handles and profile lights — often not included.
- Transport and lift charges, especially in older buildings.
- Debris removal after work.
- Society deposits for renovation (paid to the society, not the contractor).
- Electrical and painting work linked to the furniture.
- GST if applicable.
Contract basis or labour basis?
On contract basis, the contractor supplies material and labour for one price. On labour basis, you buy the material and pay only for work. Each has pros and cons — read our contract vs labour basis guide.
Payment schedule
A common and fair pattern is an advance on signing, a payment when the framework is complete, and the balance on completion. Avoid paying the full amount before work starts.
Before you sign
- Check that every item and size is listed.
- Check material brands and grades.
- Agree on the timeline and what happens if it slips.
- Keep everything in writing, including changes made later.
We give clear, item-wise quotations after a free site visit. Ask for an estimate.



